Rectifier and regulating transformer
2016-02-24 16:39:00
 
 
 

RUBBER SEALING

Rectifier and regulating transformer

1

Hv bushing installation

2

High pressure rise a

3

 508.2

4

INSPECTING WINDOW

5

Zero photograph casing installation

6

Zero phase rise a

7

 508.3

8

Medium voltage rise a

9

508.1

10

508.9

11

Oil-oil casing installation

12

Whole become box along the strip

13

 M23

14

Modulation box along the strip

15

 M23

16

Transformer fuse the

17

652

18

653

19

654

20

Random

21

Compensation casing installation

22

238.7

23

238.9

24

Grounding casing installation

25

 238.5

26

Φ 80 trap

27

Φ 25 trap Φ 30 pipe

29

Gas relay Φ 80 pipe

30

pressure relief valve

31

manhole

32

The main transformer low voltage side window inspection

33

Even the tube Φ 150 pipe

34

Φ 245 tube

36

Φ 50 tube

38

Deflated plug

39

242

40

92

41

188.2

42

Oil a table YZF-250

43

Oil a table YZF-140

44

pipeline