Current:Home > +Power plant IPP
+Power plant IPP
NOZZLE ASSEMBLY BOILER with IBR form IIC
2014-07-20 22:39:59
We supply NOZZLE  ASSEMBLY FOR boiler along with IBR form IIC for power plant  IPP
NOZZLE, ASSEMBLY; TYPE: SECONDARY DESUPERHEATED, APPLICATION: SUPER HEATER SECOND STAGE ATTEMPERATION SYSTEM;
 
 
 
 
 
We supply NOZZLE  ASSEMBLY FOR BOILER  along with IBR form IIC for power plant  IPP
NOZZLE, ASSEMBLY; TYPE:PRIMARY DESUPERHEATED, APPLICATION SUPER HEATER FIRST STAGE ATTEMPERATION SYSTEM;
 
 
 
We supply NOZZLE, ASSEMBLY; TYPE:RE-HEATER DESUPERHEATER, APPLICATION: RE-HEATER ATTEMPERATION SYSTEM BOILER along with IBR form IIC for power plant IPP
NOZZLE, ASSEMBLY; TYPE:RE-HEATER DESUPERHEATER, APPLICATION: RE-HEATER ATTEMPERATION SYSTEM;
 
 
 
 
 
 Email of KGC
comkgc@163.com
WeChat NO
CH-0086-13877625497
Contact ,mobile
Mr. Chintu, 008613877625497
Website